Is Wood Dust The New Spotted Owl
Article by Dan Shell, Senior Editor, Timber Processing
Following tragic and devastating explosions and fires at two British Columbia sawmills in Burns Lake and Prince George that killed four workers and injured dozens, leave it to EarthFirst! on its official news site to put a morbid, anti-human perspective on the destruction: “In any case, there’s two less mills in the world. For now, we say bravo to the beetle.”
Of course, EarthFirst! has no credibility whatsoever on any issue in the real world, but what’s this about the beetle?
While full in-depth investigations on the two fires are yet to be completed, preliminary reports are filled with speculation that somehow the beetle-damaged timber being processed by both mills was in large part responsible for the explosions due to the extreme dryness of the logs and the fine sawdust created during sawing.
Those who would like to see all sawmills shut down have already grabbed onto the mill explosion headlines and are spinning it their way, claiming that this is further proof that damaged and dead timber shouldn’t be utilized and should instead be left to rot—or more likely burn. (Never mind that uncontrollable wildfires in dead or distressed timber stands do untold damage to wildlife and water quality.)
But back to the beetle and the dust: The mountain pine bark beetle threat is definitely real, and impacting forests from Mexico to northern Canada. A recent report from International Wood Markets noted the beetle has already killed an estimated 59% of BC Interior pine forests, and 25% of the sawmills and plywood plants operating in BC in 2005 have since been shut down. According to a University of Colorado study, the damage in BC alone covers 13 million hectares (32 million acres).
Though many mills have been sawing beetle-damaged and killed timber for the better part of a decade, reports show much of the timber is now reaching a marginal state that’s not viable for processing.
In response to the two incidents, WorkSafe BC, a provincial occupational safety agency, ordered an immediate inspection for sawdust buildup at all BC sawmills. Investigators in preliminary reports have stated ignition sources in both the recent mill incidents appear to have been located at the conveyor level, where electrical and or mechanical equipment was in operation in areas contained by walls and equipment at a lower level of the mill below the main mill floor.
British Columbia’s major forest products manufacturers have also announced a formal task force to: quantify combustion risks for both green and dry sawdust; identify best practices for dust mitigation from other industries; develop an industry-wide auditable standard to provide independent assurance of mill safety; and undertake outreach to all province forest products manufacturers to boost safety at all facilities.
Until now, much of the regulation and mitigation of wood dust exposure has been focused on respiratory issues. Though the incidents in British Columbia are extremely rare (When’s the last time you heard of a sawmill green end “exploding”?), with the rise of dust-related incidents at fuel pellet mills, you can bet the government will be taking a much closer look at dust combustion in the future.
Latest News
Sawmillers Show Up: TP&EE Portland 2022 Was A Success
The recent Timber Processing & Energy Expo, held in Portland, Ore. September 28-30, had a knockout crowd of sawmillers from around the globe walking the aisles. 110 wood producer companies sent representatives to the three-day trade show which featured a sold-out exhibit floor, and one-day…
Valutec TC Kilns See North American Success
As a leading developer and world leader in continuous dry kilns Valutec has delivered more than 2,000 continuous kilns to sawmills around the world. In 2020, the company commissioned North America’s first TC continuous kiln at Pleasant River’s Moose River Lumber in Jackman, Me. Now, another eight kilns are up and running, or being installed in North America…
SmartLam Plans Glulam Facility
SmartLam North America, reportedly the largest manufacturer in North America of cross-laminated timber (CLT), announced it will build a $50 million glulam manufacturing facility in Dothan, Ala. The new SmartLam facility, to be built adjacent SmartLam’s existing CLT facility in a 144,000 sq. ft. structure, will manufacture…
Peak Announce SYP Pellet Mill
Vancouver, Canada-based Peak Renewables plans to build a 180,000 metric tons per year wood pellet mill in Dothan, Ala. The $30 million project will utilize residuals from Rex Lumber sawmills in the area. Construction on the facility is expected to be completed by mid-2023. Peak is building the plant adjacent the SmartLam cross-laminated timber plant and upcoming glulam facility in Dothan…
Find Us On Social
Newsletter
The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.
Subscribe/Renew
Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.