Idaho Producers Supply Mass Timber Arena
Industry stakeholders of all types worked to supply materials for the recently opened ICCU Basketball Arena at the University of Idaho in Moscow. The 4,000 seat facility, which opened in October 2021, incorporates several innovative mass timber elements across some of the longest spans in the country. Designers and engineers were able to source many of the structural wood products and materials to make them—including cross-laminated timber (CLT), dowel-laminated timber (DLT), glulam, plywood, and cedar siding—from local suppliers and producers.
Some of the timber used was specifically harvested from the university’s experimental forest. Associated Loggers Council-Idaho board member Mark Swanson, of Swanson Logging in Lewiston, was on hand for the grand opening. Aaron Walter Logging, Frederickson Logging, Jack Buell Trucking and other contractors also participated in the effort.
Local manufacturers that supplied wood products included Boise Cascade, PotlatchDeltic, QB Corp., Idaho Forestry Group and Tri-Pro Cedar Products. The structural engineer of record was StructureCraft, which fabricated the roof structure and associated timbers and specialty engineered wood components.
The facility is noted for its use of EWPs in innovative ways, such as a plywood roof diaphragm that clear-spans 250 feet from end-to-end of the arena and acts as the lateral bracing system for both wind and seismic loads. A review in an architectural paper explains that the building incorporates “a hybrid structural system comprising glulam beams, steel king-post trusses, and concrete shear walls that rises to form a broad canopy over a cast-in-place concrete seating bowl, itself ensconced in a trim of zinc-and-glass curtain wall.”
Designers pursued a rolling geometric motif reflecting the surrounding Palouse region’s channeled scablands created by cataclysmic floods at the end of the Ice Age.
Latest News
New Year Brings In Housing Starts Dip
U.S. housing starts dropped 4.1% in January 2022 from December 2021 to a seasonally adjusted annual rate of 1.638 million, according to the U.S. Census Bureau and U.S. Dept. of Housing and Urban Development monthly new residential construction report. Single-family starts in January were…
Schooler Is Leaving Big Shoes To Fill
Article by Rich Donnell, Editor-in-Chief, Timber Processing January/February 2022 – We’ve always considered our 34th Person of the Year, Eric Schooler, as one of the good guys. One reason, rather selfishly on our part, is because during his tenures at Hampton Lumber and Collins Companies, when we called up and…
Price, Daniels Assume Evergreen CEO Roles
Evergreen Engineering announces the transition of its company leadership from President Gordon Yutzy to existing principals and partners, Justin Price and Danielle Daniels. Yutzy, who has served as president since 2009, will continue to serve as a principal and liaison for his longstanding clients as he prepares for…
Find Us On Social
Newsletter
The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.
Subscribe/Renew
Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.